
New TopShim run:

version = topshim 2.4.0
date = 2026-11-12
time = 16:31:58.116
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 0.2 Hz, Target= 0.3 Hz, After= 1.0 Hz
Iteration  2: FWHM Before= 1.0 Hz, Target= 0.5 Hz, After= 0.6 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.905

shim changes: 
Z	+111
Z2	+118
Z3	+135
Z4	-576

duration = 2 min 15 sec
completed successfully
finished Thu Nov 12 16:34:11 2026


========================================================================
