
New TopShim run:

version = topshim 2.4.0
date = 2026-11-02
time = 12:48:30.916
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 3.0 Hz, Target= 0.5 Hz, After= 0.8 Hz
Iteration  2: FWHM Before= 0.8 Hz, Target= 0.2 Hz, After= 0.5 Hz
Iteration  3: FWHM Before= 0.5 Hz, Target= 0.5 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.706

shim changes: 
Z	+161
Z2	+207
Z3	+393
Z4	+405

duration = 1 min 37 sec
completed successfully
finished Mon Nov 02 12:50:06 2026


========================================================================
