New TopShim run:

version = topshim 2.4.0
date = 2026-11-09
time = 18:32:05.711
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 3.1 Hz, Target= 0.5 Hz, After= 0.3 Hz
Iteration  2: FWHM Before= 0.3 Hz, Target= 0.3 Hz, After= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.512

shim changes: 
Z	+91
Z2	+5
Z3	+146
Z4	+570

duration = 1 min 36 sec
completed successfully
finished Mon Nov 09 18:33:40 2026


========================================================================