
New TopShim run:

version = topshim 2.4.0
date = 2026-11-09
time = 13:11:16.523
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 2.2 Hz, Target= 0.3 Hz, After= 0.3 Hz
Iteration  2: FWHM Before= 0.3 Hz, Target= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.591

shim changes: 
Z	+21
Z2	+50
Z3	+239
Z4	+387

duration = 1 min 47 sec
completed successfully
finished Mon Nov 09 13:13:02 2026


========================================================================
