
New TopShim run:

version = topshim 2.4.0
date = 2026-11-09
time = 10:26:14.335
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 3.1 Hz, Target= 0.4 Hz, After= 0.2 Hz
Iteration  2: FWHM Before= 0.2 Hz, Target= 0.5 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.733

shim changes: 
Z	+116
Z2	+22
Z3	+153
Z4	+750

duration = 1 min 47 sec
completed successfully
finished Mon Nov 09 10:28:00 2026


========================================================================
