
New TopShim run:

version = topshim 2.4.0
date = 2026-11-09
time = 12:11:51.201
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 1.2 Hz, Target= 0.4 Hz, After= 1.4 Hz
Iteration  2: FWHM Before= 1.4 Hz, Target= 0.9 Hz, After= 1.0 Hz
Iteration  3: FWHM Before= 1.0 Hz, Target= 1.0 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.28

shim changes: 
Z	-35
Z2	-113
Z3	-209
Z4	+277

duration = 2 min 53 sec
completed successfully
finished Mon Nov 09 12:14:43 2026


========================================================================
