
New TopShim run:

version = topshim 2.4.0
date = 2026-11-05
time = 15:50:26.886
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 1.1 Hz, Target= 0.6 Hz, After= 0.6 Hz
Iteration  2: FWHM Before= 0.6 Hz, Target= 1.0 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.909

shim changes: 
Z	+9
Z2	+44
Z3	-2
Z4	+102

duration = 1 min 47 sec
completed successfully
finished Thu Nov 05 15:52:12 2026


========================================================================
