
New TopShim run:

version = topshim 2.4.0
date = 2026-11-06
time = 15:29:15.073
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 6.0 Hz, Target= 2.1 Hz, After= 2.3 Hz
Iteration  2: FWHM Before= 2.3 Hz, Target= 2.9 Hz, After= 4.1 Hz
Iteration  3: FWHM Before= 4.1 Hz, Target= 2.7 Hz, After= 3.8 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 3.3

shim changes: 
Z	+199
Z2	-143
Z3	-350
Z4	+1226

duration = 3 min 35 sec
completed successfully
finished Fri Nov 06 15:32:48 2026


========================================================================
