
New TopShim run:

version = topshim 2.4.0
date = 2026-11-11
time = 15:58:28.327
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Required SINO has not been achieved!
Please increase DURMAX if a better map quality is needed.
Required SINO has not been achieved!
Please increase DURMAX if a better map quality is needed.
Iteration  1: FWHM Before=10.9 Hz, Target= 0.8 Hz, After= 0.6 Hz
Required SINO has not been achieved!
Please increase DURMAX if a better map quality is needed.
Iteration  2: FWHM Before= 0.6 Hz, Target= 0.5 Hz, After= 0.9 Hz
Required SINO has not been achieved!
Please increase DURMAX if a better map quality is needed.
Iteration  3: FWHM Before= 0.9 Hz, Target= 0.6 Hz, After= 0.2 Hz
echo time must be reduced
Iteration  4: FWHM Before= 0.2 Hz, Target= 0.8 Hz, After= 0.9 Hz
Iteration  5: FWHM Before= 0.9 Hz, Target= 1.2 Hz, After= 2.7 Hz
Iteration  6: FWHM Before= 2.7 Hz, Target= 1.6 Hz, After= 2.0 Hz
Iteration  7: FWHM Before= 2.0 Hz, Target= 0.6 Hz, After= 1.4 Hz
Iteration  8: FWHM Before= 1.4 Hz, Target= 0.9 Hz, After= 2.4 Hz
Iteration  9: FWHM Before= 2.4 Hz, Target= 1.0 Hz, After= 0.8 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.5

shim changes: 
Z	+286
Z2	+230
Z3	-119
Z4	-209

duration = 16 min 34 sec
completed successfully
finished Wed Nov 11 16:15:01 2026


========================================================================
