
New TopShim run:

version = topshim 2.4.0
date = 2026-11-12
time = 02:32:36.306
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 0.5 Hz, Target= 0.4 Hz, After= 1.5 Hz
Iteration  2: FWHM Before= 1.5 Hz, Target= 0.4 Hz, After= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.745

shim changes: 
Z	-41
Z2	-131
Z3	+7
Z4	+818

duration = 2 min 27 sec
completed successfully
finished Thu Nov 12 02:35:02 2026


========================================================================
