
New TopShim run:

version = topshim 2.4.0
date = 2026-11-02
time = 22:43:40.978
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 1.8 Hz, Target= 2.0 Hz, After= 2.5 Hz
Iteration  2: FWHM Before= 2.5 Hz, Target= 1.3 Hz, After= 2.8 Hz
Iteration  3: FWHM Before= 2.8 Hz, Target= 0.3 Hz, After= 0.7 Hz
Iteration  4: FWHM Before= 0.7 Hz, Target= 1.6 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.82

shim changes: 
Z	-97
Z2	+337
Z3	+178
Z4	-3299

duration = 3 min 47 sec
completed successfully
finished Mon Nov 02 22:47:26 2026


========================================================================
