
New TopShim run:

version = topshim 2.4.0
date = 2026-11-11
time = 14:28:24.124
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 0.5 Hz, Target= 0.5 Hz, After= 0.7 Hz
Iteration  2: FWHM Before= 0.7 Hz, Target= 0.6 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.752

shim changes: 
Z	+44
Z2	+88
Z3	-3
Z4	-359

duration = 1 min 46 sec
completed successfully
finished Wed Nov 11 14:30:09 2026


========================================================================
