
New TopShim run:

version = topshim 2.4.0
date = 2026-11-11
time = 13:11:16.152
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 1.3 Hz, Target= 1.3 Hz, After= 2.1 Hz
Iteration  2: FWHM Before= 2.1 Hz, Target= 1.7 Hz, After= 1.5 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 2.07

shim changes: 
Z	-20
Z2	+89
Z3	+215
Z4	-1395

duration = 3 min 32 sec
completed successfully
finished Wed Nov 11 13:14:46 2026


========================================================================
