
New TopShim run:

version = topshim 2.4.0
date = 2026-11-09
time = 16:41:00.903
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Required SINO has not been achieved!
Please increase DURMAX if a better map quality is needed.
Required SINO has not been achieved!
Please increase DURMAX if a better map quality is needed.
Iteration  1: FWHM Before= 1.9 Hz, Target= 0.6 Hz, After= 0.6 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.767

shim changes: 
Z	-19
Z2	+25
Z3	-43
Z4	+336

duration = 3 min 55 sec
completed successfully
finished Mon Nov 09 16:44:54 2026


========================================================================
