
New TopShim run:

version = topshim 2.4.0
date = 2026-11-02
time = 19:58:36.195
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 1.8 Hz, Target= 1.1 Hz, After= 1.1 Hz
Iteration  2: FWHM Before= 1.1 Hz, Target= 1.2 Hz, After= 1.1 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.55

shim changes: 
Z	-35
Z2	+20
Z3	+34
Z4	-194

duration = 2 min 39 sec
completed successfully
finished Mon Nov 02 20:01:15 2026


========================================================================
