
New TopShim run:

version = topshim 2.4.0
date = 2026-11-02
time = 10:42:45.877
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 3.2 Hz, Target= 0.3 Hz, After= 1.3 Hz
Iteration  2: FWHM Before= 1.3 Hz, Target= 0.3 Hz, After= 2.3 Hz
Iteration  3: FWHM Before= 2.3 Hz, Target= 0.2 Hz, After= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.04

shim changes: 
Z	-11
Z2	-78
Z3	-310
Z4	+565

duration = 2 min 43 sec
completed successfully
finished Mon Nov 02 10:45:27 2026


========================================================================
