
New TopShim run:

version = topshim 2.4.0
date = 2026-11-13
time = 17:21:31.296
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 0.2 Hz, Target= 0.4 Hz, After= 0.8 Hz
Iteration  2: FWHM Before= 0.8 Hz, Target= 0.3 Hz, After= 0.7 Hz
Iteration  3: FWHM Before= 0.7 Hz, Target= 0.6 Hz, After= 0.6 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.916

shim changes: 
Z	+135
Z2	+167
Z3	+505
Z4	+1484

duration = 2 min 4 sec
completed successfully
finished Fri Nov 13 17:23:34 2026


========================================================================
