
New TopShim run:

version = topshim 2.4.0
date = 2026-11-05
time = 13:03:52.119
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 1.1 Hz, Target= 0.5 Hz, After= 0.7 Hz
Iteration  2: FWHM Before= 0.7 Hz, Target= 0.5 Hz, After= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.722

shim changes: 
Z	-59
Z2	+3
Z3	-151
Z4	+829

duration = 2 min 15 sec
completed successfully
finished Thu Nov 05 13:06:05 2026


========================================================================
