
New TopShim run:

version = topshim 2.4.0
date = 2026-11-05
time = 12:36:42.755
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 0.2 Hz, Target= 0.2 Hz, After= 1.0 Hz
Iteration  2: FWHM Before= 1.0 Hz, Target= 0.3 Hz, After= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.736

shim changes: 
Z	+73
Z2	-30
Z3	-107
Z4	+86

duration = 2 min 53 sec
completed successfully
finished Thu Nov 05 12:39:34 2026


========================================================================
