
New TopShim run:

version = topshim 2.4.0
date = 2026-11-04
time = 21:23:47.153
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 0.2 Hz, Target= 0.5 Hz, After= 0.6 Hz
Iteration  2: FWHM Before= 0.6 Hz, Target= 0.3 Hz, After= 0.7 Hz
Iteration  3: FWHM Before= 0.7 Hz, Target= 0.6 Hz, After= 0.6 Hz
Iteration  4: FWHM Before= 0.6 Hz, Target= 0.5 Hz, After= 0.6 Hz
Iteration  5: FWHM Before= 0.6 Hz, Target= 0.6 Hz, After= 0.8 Hz
Iteration  6: FWHM Before= 0.8 Hz, Target= 0.3 Hz, After= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.602

shim changes: 
Z	+78
Z2	+3
Z3	-38
Z4	+62

duration = 5 min 10 sec
completed successfully
finished Wed Nov 04 21:28:56 2026


========================================================================
