
New TopShim run:

version = topshim 2.4.0
date = 2026-11-03
time = 20:20:21.955
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 2.4 Hz, Target= 0.8 Hz, After= 1.2 Hz
Iteration  2: FWHM Before= 1.2 Hz, Target= 1.1 Hz, After= 0.8 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.12

shim changes: 
Z	+39
Z2	+52
Z3	-106
Z4	+198

duration = 2 min 14 sec
completed successfully
finished Tue Nov 03 20:22:34 2026


========================================================================
