
New TopShim run:

version = topshim 2.4.0
date = 2026-11-03
time = 20:08:48.157
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 2.1 Hz, Target= 0.5 Hz, After= 0.9 Hz
Iteration  2: FWHM Before= 0.9 Hz, Target= 0.8 Hz, After= 1.2 Hz
Iteration  3: FWHM Before= 1.2 Hz, Target= 0.7 Hz, After= 0.7 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.981

shim changes: 
Z	+51
Z2	-51
Z3	+257
Z4	+1415

duration = 2 min 42 sec
completed successfully
finished Tue Nov 03 20:11:29 2026


========================================================================
