
New TopShim run:

version = topshim 2.4.0
date = 2026-11-11
time = 18:38:43.644
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 2.8 Hz, Target= 0.8 Hz, After= 1.2 Hz
Iteration  2: FWHM Before= 1.2 Hz, Target= 0.3 Hz, After= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.793

shim changes: 
Z	-26
Z2	+26
Z3	-137
Z4	-344

duration = 4 min 48 sec
completed successfully
finished Wed Nov 11 18:43:30 2026


========================================================================
