
New TopShim run:

version = topshim 2.4.0
date = 2026-11-03
time = 12:10:25.179
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 2.8 Hz, Target= 1.7 Hz, After= 1.9 Hz
Iteration  2: FWHM Before= 1.9 Hz, Target= 2.0 Hz, After= 1.9 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.64

shim changes: 
Z	+1
Z2	+37
Z3	+98
Z4	+405

duration = 2 min 14 sec
completed successfully
finished Tue Nov 03 12:12:38 2026


========================================================================
