
New TopShim run:

version = topshim 2.4.0
date = 2026-09-25
time = 22:37:55.286
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 2.3 Hz, Target= 0.6 Hz, After= 0.6 Hz
Iteration  2: FWHM Before= 0.6 Hz, Target= 0.5 Hz, After= 0.6 Hz
Iteration  3: FWHM Before= 0.6 Hz, Target= 0.5 Hz, After= 0.6 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.22

shim changes: 
Z	+6
Z2	+73
Z3	-119
Z4	-968

duration = 3 min 35 sec
completed successfully
finished Fri Sep 25 22:41:28 2026


========================================================================
