
New TopShim run:

version = topshim 2.4.0
date = 2026-09-28
time = 18:23:40.703
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 2.4 Hz, Target= 0.6 Hz, After= 0.8 Hz
Iteration  2: FWHM Before= 0.8 Hz, Target= 0.6 Hz, After= 0.5 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.19

shim changes: 
Z	+15
Z2	-25
Z3	+64
Z4	-274

duration = 2 min 16 sec
completed successfully
finished Mon Sep 28 18:25:55 2026


========================================================================
