
New TopShim run:

version = topshim 2.4.0
date = 2026-09-28
time = 15:48:13.166
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 2.9 Hz, Target= 0.3 Hz, After= 0.3 Hz
Iteration  2: FWHM Before= 0.3 Hz, Target= 0.3 Hz, After= 0.2 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.797

shim changes: 
Z	+1
Z2	+95
Z3	-136
Z4	-139

duration = 2 min 15 sec
completed successfully
finished Mon Sep 28 15:50:27 2026


========================================================================
