
New TopShim run:

version = topshim 2.4.0
date = 2026-10-26
time = 14:23:13.356
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 2.2 Hz, Target= 0.3 Hz, After= 1.0 Hz
Iteration  2: FWHM Before= 1.0 Hz, Target= 0.3 Hz, After= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.476

shim changes: 
Z	+70
Z2	+47
Z3	+186
Z4	+472

duration = 2 min 14 sec
completed successfully
finished Mon Oct 26 14:25:26 2026


========================================================================
