
New TopShim run:

version = topshim 2.4.0
date = 2026-10-19
time = 14:21:26.437
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 2.4 Hz, Target= 0.5 Hz, After= 0.2 Hz
Iteration  2: FWHM Before= 0.2 Hz, Target= 0.8 Hz, After= 0.6 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.627

shim changes: 
Z	+343
Z2	+368
Z3	+1022
Z4	+2214

duration = 2 min 3 sec
completed successfully
finished Mon Oct 19 14:23:28 2026


========================================================================
