
New TopShim run:

version = topshim 2.4.0
date = 2026-09-25
time = 20:15:04.168
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 1.9 Hz, Target= 0.4 Hz, After= 1.8 Hz
Iteration  2: FWHM Before= 1.8 Hz, Target= 0.6 Hz, After= 0.5 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.1

shim changes: 
Z	+88
Z2	+72
Z3	+250
Z4	+526

duration = 2 min 17 sec
completed successfully
finished Fri Sep 25 20:17:19 2026


========================================================================
