
New TopShim run:

version = topshim 2.4.0
date = 2026-09-24
time = 22:33:19.928
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 4.5 Hz, Target= 0.7 Hz, After= 0.7 Hz
Iteration  2: FWHM Before= 0.7 Hz, Target= 0.2 Hz, After= 0.3 Hz
Iteration  3: FWHM Before= 0.3 Hz, Target= 0.2 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.907

shim changes: 
Z	-426
Z2	-603
Z3	-1288
Z4	-2059

duration = 2 min 55 sec
completed successfully
finished Thu Sep 24 22:36:13 2026


========================================================================
