
New TopShim run:

version = topshim 2.4.0
date = 2026-10-23
time = 16:59:58.184
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 9.9 Hz, Target= 2.0 Hz, After= 0.9 Hz
Iteration  2: FWHM Before= 0.9 Hz, Target= 0.6 Hz, After= 2.5 Hz
Iteration  3: FWHM Before= 2.5 Hz, Target= 0.2 Hz, After= 0.4 Hz
Iteration  4: FWHM Before= 0.4 Hz, Target= 0.2 Hz, After= 1.8 Hz
Iteration  5: FWHM Before= 1.8 Hz, Target= 1.3 Hz, After= 1.2 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.28

shim changes: 
Z	+728
Z2	-1353
Z3	+4437
Z4	-8271

duration = 3 min 39 sec
completed successfully
finished Fri Oct 23 17:03:37 2026


========================================================================
