
New TopShim run:

version = topshim 2.4.0
date = 2026-10-23
time = 18:23:47.811
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 2.0 Hz, Target= 0.2 Hz, After= 2.5 Hz
Iteration  2: FWHM Before= 2.5 Hz, Target= 1.4 Hz, After= 1.2 Hz
Iteration  3: FWHM Before= 1.2 Hz, Target= 0.8 Hz, After= 2.9 Hz
Iteration  4: FWHM Before= 2.9 Hz, Target= 0.3 Hz, After= 1.1 Hz
Iteration  5: FWHM Before= 1.1 Hz, Target= 1.0 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.51

shim changes: 
Z	-240
Z2	-427
Z3	-1136
Z4	-5125

duration = 3 min 25 sec
completed successfully
finished Fri Oct 23 18:27:11 2026


========================================================================
