
New TopShim run:

version = topshim 2.4.0
date = 2026-10-21
time = 20:58:00.207
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 0.9 Hz, Target= 0.5 Hz, After= 0.6 Hz
Iteration  2: FWHM Before= 0.6 Hz, Target= 0.8 Hz, After= 0.6 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.806

shim changes: 
Z	+124
Z2	+162
Z3	-15
Z4	+33

duration = 2 min 17 sec
completed successfully
finished Wed Oct 21 21:00:15 2026


========================================================================
