
New TopShim run:

version = topshim 2.4.0
date = 2026-09-22
time = 20:03:27.992
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 1.1 Hz, Target= 1.1 Hz, After= 1.1 Hz
Iteration  2: FWHM Before= 1.1 Hz, Target= 1.2 Hz, After= 1.0 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.21

shim changes: 
Z	-26
Z2	-28
Z3	-18
Z4	+107

duration = 2 min 16 sec
completed successfully
finished Tue Sep 22 20:05:42 2026


========================================================================
