
New TopShim run:

version = topshim 2.4.0
date = 2026-10-23
time = 12:31:17.384
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before=11.1 Hz, Target= 2.0 Hz, After= 2.3 Hz
Iteration  2: FWHM Before= 2.3 Hz, Target= 2.1 Hz, After= 2.2 Hz
Iteration  3: FWHM Before= 2.2 Hz, Target= 1.9 Hz, After= 2.4 Hz
Iteration  4: FWHM Before= 2.4 Hz, Target= 2.1 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 3.41

shim changes: 
Z	+88
Z2	-105
Z3	+471
Z4	+2910

duration = 3 min 34 sec
completed successfully
finished Fri Oct 23 12:34:50 2026


========================================================================
