
New TopShim run:

version = topshim 2.4.0
date = 2026-10-23
time = 12:11:38.912
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 7.1 Hz, Target= 2.0 Hz, After= 2.2 Hz
Iteration  2: FWHM Before= 2.2 Hz, Target= 1.8 Hz, After= 2.0 Hz
Iteration  3: FWHM Before= 2.0 Hz, Target= 1.9 Hz, After= 2.1 Hz
Iteration  4: FWHM Before= 2.1 Hz, Target= 2.1 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 2.05

shim changes: 
Z	-71
Z2	+164
Z3	-54
Z4	-710

duration = 3 min 34 sec
completed successfully
finished Fri Oct 23 12:15:11 2026


========================================================================
