
New TopShim run:

version = topshim 2.4.0
date = 2026-10-20
time = 12:11:41.294
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 0.4 Hz, Target= 0.4 Hz, After= 0.7 Hz
Iteration  2: FWHM Before= 0.7 Hz, Target= 0.3 Hz, After= 0.2 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.418

shim changes: 
Z	+198
Z2	+155
Z3	+436
Z4	+1495

duration = 2 min 16 sec
completed successfully
finished Tue Oct 20 12:13:55 2026


========================================================================
