
New TopShim run:

version = topshim 2.4.0
date = 2026-10-20
time = 11:41:01.563
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 8.3 Hz, Target= 0.3 Hz, After= 0.3 Hz
Iteration  2: FWHM Before= 0.3 Hz, Target= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.414

shim changes: 
Z	+104
Z2	+71
Z3	+210
Z4	+178

duration = 1 min 47 sec
completed successfully
finished Tue Oct 20 11:42:47 2026


========================================================================
