
New TopShim run:

version = topshim 2.4.0
date = 2026-09-30
time = 22:27:49.949
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 1.8 Hz, Target= 0.4 Hz, After= 0.8 Hz
Iteration  2: FWHM Before= 0.8 Hz, Target= 0.8 Hz, After= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.641

shim changes: 
Z	+45
Z2	+69
Z3	-275
Z4	-2229

duration = 1 min 50 sec
completed successfully
finished Wed Sep 30 22:29:38 2026


========================================================================
