
New TopShim run:

version = topshim 2.4.0
date = 2026-10-01
time = 02:02:48.097
command = topshim  convcomp ordmax=4

FINE SHIMMING

Parameters:

probe = Z104275_0310
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 3.7 Hz, Target= 0.2 Hz, After= 0.6 Hz
Iteration  2: FWHM Before= 0.6 Hz, Target= 0.3 Hz, After= 1.4 Hz
Iteration  3: FWHM Before= 1.4 Hz, Target= 0.9 Hz, After= 0.7 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.893

shim changes: 
Z	-70
Z2	-15
Z3	-55
Z4	-492

duration = 2 min 44 sec
completed successfully
finished Thu Oct 01 02:05:30 2026


========================================================================
